Center for the Complete Management of Mobility in the City of Granada in English

Home  :  Traffic cut in San Matías St

Traffic cut in San Matías St

Traffic cut in 3 San Matías St takes place according to the following plan:

Cuadro de San Antonio St (between streets Sarabia and Piedra Santa). - Total traffic cut between 28/01/26 and 25/02/26, reopening street at the end of each working day and giving access to garages in the area in Piedra Santa St through Escudo del Carmen St, regulated by work operators.

Piedra Santa St (section between Cuadro de San Antonio St and Centro de Transformación de EN DESA in Piedra Santa St). - Total traffic cut from 26/2/26 and 13/3/26, reopening street at the end of each working day and giving access to garages in the area in Piedra Santa St through Escudo del Carmen St, regulated by work operators.

Traffic will be shut only as necessary to carry out works. Road can not be closed to traffic if works are not being carried out. There must be free access to garages in the area, helped by works operators.

File 6.409/26

Location


Twitter cgimgranada Facebook Youtube Telegram Instagram